Logo Loading

Selva Project

Project Info
  • Construction Date: 2014
  • Location: 6th of October City
  • Category: Previous, Selva
Project Details

Selva Project:
Due to the importance of the site Silva, where it is in the forefront of the entrance of the area of the small investor was to be a project work distinctive and remarkable for the importance of its location and that the distinctive design and brilliant colors of the building.
The Silva project was launched in 2014 and is located in the 6th of October City

More Project Details

Selva:
Due to the importance of the site Selva, where it is in the forefront of the entrance of the area of the small investor was to be a project work distinctive and remarkable for the importance of its location and that the distinctive design and brilliant colors of the building.
The Selva project was launched in 2014 and is located in the 6th of October City
It is a residential building consisting of five floors on each floor of five residential units, different in areas, design, view and armored doors, as well as an inner courtyard with a large playground for children and a pool of people, elevator, intercom, surveillance cameras and an outdoor courtyard equipped with grass and flowers.